Outdoor staircase with illuminated handrails at night — illustrative lighting reference

LUMIBRIGHT

Brick Light

Low-level lighting can mark changes in level and define a route through the built detail. Coordinate openings, housing depth and cable access before construction, and confirm the selected article’s installation and environmental requirements.

Integrated brick and step lighting should be planned with the surrounding construction. Compare the recess, visible aperture and distribution with the stair or pathway geometry. Avoid exposed bright sources at normal viewing positions. Confirm the model-specific environment rating and fixing method, and make the construction detail available beside the product selection.

How to compare recess, mounting height, glare and load where relevant

Model specifications and downloads

60 families, 111 articles with published specifications.

Where to go next

Brick and step lighting for Dubai and UAE projects

A lighting schedule for a Dubai hotel, a UAE retail fit-out or a private villa starts with the architecture and the activity in each space. Compare the light distribution, mounting detail, colour quality and control requirements together, then keep the selected model and order code with the project drawings.

Façade and exterior lighting

For façades and outdoor spaces in the UAE, coordinate the lighting position with the building surface, viewing distances and surrounding environment. Compare the distribution and installation detail alongside exposure and maintenance access. Project calculations and the selected model data should guide coverage, glare and spill-light decisions.